HOT NOVEL UPDATES



Hint: To Play after pausing the player, use this button

Speaking of which, is the magic train complete, Kyle?

"Ah, that one was just finished. It can be used without any problems in Vulcania commissioning. But if we're going to use it on the ground, we might have to think about something."

"What do I have to think about?

"It's not the same speed, Mr. Ars. The magic train created a rotating mechanism with reference to how to make a magic weapon, and used it as a driving part to move the train. So, the finished magic train can run fast, tirelessly, day and night, right?

Yeah, that's what happens.

"But what about the train Valkyrie used to run? Although magic trains run at different speeds than existing trains, it can be a lot of trouble to operate on the same track.

After I installed the dubious name of God's shield as Ars Barca in the church.

I came back to Vulcania, where I was talking to Kyle, who was studying magic trains.

I see.

Maybe Kyle has a point.

In this way, even if you try to use the Shinkansen on the same route as the stops at each station, you will not be able to demonstrate its performance.

If the Shinkansen had stopped along with other trains stopping at all stations, there would be no point in how fast the Shinkansen would have stopped.

Moreover, for now, the tracks built in the Kingdom of Fontana are basically single lines.

It is also difficult to take up a system where the Valkyrie train pauses and waits for the magic train to overtake.

"Besides, there are other problems. The spiritual stones you need in the driving part of the magic train are made with magic by Mr. Ars, right? This means that it is not generally available and can be a valuable item. If you don't know how much of a magic train will be built in the future, I think you should think carefully and decide how to operate it."

I see. Well, I suppose so. Besides, it could be troublesome if something happens outside of Balkan faction range. Then why don't we take a new track and build a special line for magic trains? "

"You're going to build a railroad line that connects Bite Brother to Mr. Vargas' land?

I see. Let's build a crossing train that I gave up once before. "

After discussions with Kyle, it was decided that the operation of the magic train on the ground would be limited.

If it's true, maybe we should set up a route so that we can cover the entire kingdom of Fontana.

However, for example, in the same kingdom, when there is trouble with the magic train running in the territory controlled by other nobles and knights, it is also possible to rub it with the location of responsibility and compensation issues.

In the first place, trains are also easy to target.

They can only run on the tracks, making them easy to raid.

Therefore, it was decided to operate only in Balkan territory.

To this end, a new railway line connecting the eastern Baltic Territory and the western Bales was installed to run the magic train there.


I might have abandoned this before.

But the newly acquired territory made it possible.

In fact, the Balkans were newly added to their territory.

The reason was that I left the post of Prime Minister and General and inherited power from my son.

The reason is that I succeeded in losing my personal power, as if I had pulled myself out of battle and claimed not to harm the Fontana royal family.

I didn't want the territory, but if I can get it, I don't want to get it.

That's why they were given the territory to connect the Balkan territory to the north, the Baltic territory to the east, the Baltic territory to the west, and the Balgas territory to the west, than the city of Fontana.

As a result, the Balkans' dominance extended sideways the northernmost of the Fontana kingdoms.

Here, a new track is installed and used exclusively for magic trains.

From the east, let's carry fabrics made from metal and goat hair that can be taken from mines, and from the west, magic steel and river fish that can be taken from mud dolls in the wetlands, as well as rice that can be taken at any time.

"Well, the direction of the redevelopment of the terrestrial part that was formerly Vulcania has been decided. Let's make it a train town. Let's think about the structure of the city based on the train tracks coming in from the west and east. It would be convenient to build from scratch, since we only buried the entire land when we created the heavens."

"The city of trains. Good, that's it. Until now, we had laid tracks for places in the city, so the final point of the tracks tended to be outside the walls of the city. Instead, it seems convenient to have a structure that enters the city itself."

"Oh, and apart from the crossing train, you can use the magic train to get to Fontana. Somehow the city of Fontana will be the biggest consumer. You will be able to send products where there is demand immediately."

"I like it. Okay. Well, I'll talk to Mr. Trion. I'm sure you're thinking about designing a new city."

We lifted Vulcania from the ground to the sky.

It was good in itself, but there were big holes left on the ground.

I've been thinking about how to redevelop the land.

I was talking to the old man about making it a new, business-friendly city.

However, Barca is located north of Fontana, and basically all roads lead to Fontana rather than Vulcania.

Even if you want to make Vulcania a business land, there is a big market in front of you: the city of Fontana, even if you don't bother to go there.

So, apart from wanting to boost business, he said that it would be good if there was another clear and good concept.

That might come true with Kyle's magic train.

Connect the land with more performing magic trains than ever before, not used on other lands.

Build the city as the base for the magic train.

Thus, the redevelopment of the former Vulcania began to move towards the city of trains.



Share This :


COMMENTS

No Comments Yet

Post a new comment

Register or Login